Design Velsertunnel drainage

Other Categories

Created at: 10 Mar 2017

Description

Modelling storm water events showed that the closed part of the tunnel suffered from rainfall in the open part of the tunnel when applying standard rules for tunnel drainage. For the reconstruction of the tunnel, a new drainage system had to be developed. The drainage system of the tunnel was redesigned with lateral gullies to prevent storm water flooding.