Description
Technical Description:
Location: Barangay Talavera, Toledo City, Cebu Province
Service Contract: Citicore Solar Toledo, 60 MW Solar Power Generation (for 25 Years)
Grid: Visayas
Transmission Line: c.420 m; 69 kV
Installed Capacity: 60.0 MWdc
Inverter: Schneider Electric 550 - 800V DC – 380V AC, 1040A, 72 Inverters
COD: 30 June 2016
Design Life: 30 years
EPC Contractor(s): MCC
O&M Contractor(s): CPI
Grid Connections: Connection point to the NGCP grid through the 69 kV Calulng-Calulng substation
PV Module Description:
No. of modules: 193,440
Manufacturer: BYD and Renesola
Model: 310
Cell Type: Polycrystalline Silicon
Peak Power Output: 310Wp
Module Efficiency: 15.98/16.00%
Power Tolerance: 0/+5Wp
Temp Coefficient: -0.43% and -0.4%/°C
Each PV table is designed to have 2 rows of 20 PV modules each with 2.0 m row-to-row distance to enhance efficiency of the overall PV array
Tier 1 rated and internally accredited and approved PV module suppliers were chosen based on bankability, warranty and availability of modules