Description
inmiddels gerealiseerd, locatie is bedrijventerrein de Wildeman ten oosten van de A2
Samenvatting (Dutch description)
Floating solar park Zaltbommel
In the industrial area of Zaltbommel, a floating solar park will be built on a water retention pond. On the 5th of December, 2022, Solinoor and Stichting Future Energy Zaltbommel signed the contract for the floating solar park Zaltbommel. The construction will be initiated at the beginning of March 2023 and the solar park will be built over the course of 7 months. The project encompasses a total of 5175 panels, the equivalent of 2.85 MWp renewable solar energy. The produced energy will be used to power the business park.
By using the water area of the retention pond in this industrialised zone, additional renewable energy can be generated to make the business park more sustainable. Besides, the integration of floating solar strengthens the purpose of the water retention pond by reducing water evaporation and improving water quality.
Help us provide more detailed information about this project by
contributing!